Botaş International Ltd. (BIL) - Sivas BTC Crude Oil Pipeline, Replacement of River Bed at KP 659 (Acısu River) on the Pipeline.


Replacement of River Bed at KP 659 (Acısu River)


Owner : BIL (Botaş International Ltd.)

Contractor : Genc Sari - Dolfin Joint Venture

Reroute and reconstruction of Acısu riverbed for its possible adverse effect to the BTC pipeline at KP 659.

Construction Date: June 2008



 

 

Botaş International Ltd. (BIL) - Sivas BTC Crude Oil Pipeline, Temporary Support of the eroded Pipe Section at KP 659 (Acısu River)


Temporary Support of the eroded Pipe Section at KP 659 (Acısu River)


Owner: BIL ( Botaş International Ltd.)

Contractor: Genc Sarı - Dolfin Joint Venture

Due to the change of the stream beds, the stream bed near the pipeline, has been taken measures
with sand-cement mixture bags.

Construction Date: July 2008



 

 

BTC Co. Turkey Branch - Reinstatement works on the BTC Pipeline between Posof (Georgia border) to Ceyhan Marine Terminal


Reinstatement works on the BTC Pipeline between Posof (Georgia border) to Ceyhan Marine Terminal

Owner: BTC Co.

Contractor: Genc Sarı - Dolfin Joint Venture

Start/Completion dates: 06/2008 - 10/2008

Reinstatement works on the pipeline, where was defined (in different points)
to reinstate by BTC Co.



 

 

BTC Co. Turkey Branch - DCVG Survey, Coating Repairs Works on the BTC Pipeline


DCVG Survey, Coating Repairs Works on the BTC Pipeline

Owner: BTC Co.

Contractor: Genc Sarı - Dolfin Joint Venture

Construction Date: 06/2008 - 10/2008

After DCVG Survey, BTC Co. has defined 120 points with coordinates, on the pipeline between
Posof (Georgia Border) to Ceyhan Marine Terminal.

These points has been excavated, blasted and repaired by the Contractor.

 

 

 